| MANDT | Client | MANDT | T000 | CLNT | 000003 | 000000 | |
| DISPR | Material: MRP profile | DISPR | | CHAR | 000004 | 000000 | |
| DISMM | MRP Type | DISMM | T438A | CHAR | 000002 | 000000 | |
| DISPO | MRP Controller | DISPO | T024D | CHAR | 000003 | 000000 | |
| KZDIE | Indicator: MRP controller is buyer (deactivated) | KZDIE | | CHAR | 000001 | 000000 | |
| | |
|
| MAABC | ABC Indicator | MAABC | TMABC | CHAR | 000001 | 000000 | |
| PLIFZ | Planned Delivery Time in Days | PLIFZ | | DEC | 000003 | 000000 | |
| DZEIT | In-house production time | DZEIT | | DEC | 000003 | 000000 | |
| FHORI | Scheduling Margin Key for Floats | FHORI | T436A | CHAR | 000003 | 000000 | |
| SBDKZ | Dependent requirements ind. for individual and coll. reqmts | SBDKZ | | CHAR | 000001 | 000000 | |
| Possible Values | Individual and collective requirements | 1 | Individual requirements only | 2 | Collective requirements only |
| |
|
| KZBED | Indicator for Requirements Grouping | KZBED | | CHAR | 000001 | 000000 | |
| Possible Values T | Display of dependent requirements as a daily total | 0 | In rep. mfg, individual record in addn to total requirements |
| |
|
| EISBE | Safety Stock | EISBE | | QUAN | 000013 | 000003 | |
| MINBE | Reorder Point | MINBE | | QUAN | 000013 | 000003 | |
| DISLS | Lot Sizing Procedure within Materials Planning | DISLS | T439A | CHAR | 000002 | 000000 | |
| BSTRF | Rounding value for purchase order quantity | BSTRF | | QUAN | 000013 | 000003 | |
| BSTMI | Minimum Lot Size | BSTMI | | QUAN | 000013 | 000003 | |
| BSTMA | Maximum Lot Size | BSTMA | | QUAN | 000013 | 000003 | |
| BSTFE | Fixed lot size | BSTFE | | QUAN | 000013 | 000003 | |
| MABST | Maximum Stock Level | MABST | | QUAN | 000013 | 000003 | |
| AUSSS | Assembly scrap in percent | AUSSS | | DEC | 000005 | 000002 | |
| LOSFX | Lot-Size-Independent Costs | LOSFX | | CURR | 000011 | 000002 | |
| LAGPR | Storage Costs Percentage Code | LAGPR | T439L | CHAR | 000001 | 000000 | |
| AUFTL | Splitting Indicator | AUFTL | T439P | CHAR | 000001 | 000000 | |
| LGRAD | Service level | LGRAD | | DEC | 000003 | 000001 | |
| WEBAZ | Goods receipt processing time in days | WEBAZ | | DEC | 000003 | 000000 | |
| USEQU | Quota arrangement usage | USEQU | TMQ2 | CHAR | 000001 | 000000 | |
| PERKZ | Period Indicator | PERKZ | | CHAR | 000001 | 000000 | |
| Possible Values P | Period according to fiscal year variant | M | Monthly | W | Weekly | T | Daily | | Initial value |
| |
|
| PERIV | Fiscal Year Variant | PERIV | T009 | CHAR | 000002 | 000000 | |
| EKGRP | Purchasing Group | EKGRP | T024 | CHAR | 000003 | 000000 | |
| MRPPP | PPC Planning Calendar | MRPPP | T439G | CHAR | 000003 | 000000 | |
| SAUFT | Indicator: Repetitive Manufacturing Allowed | SA_SAUFT | | CHAR | 000001 | 000000 | |
| | |
|
| SFEPR | Repetitive Manufacturing Profile | SFEPR | T437S | CHAR | 000004 | 000000 | |
| FXHOR | Planning time fence | FXHOR | | NUMC | 000003 | 000000 | |
| VRMOD | Consumption mode | VRMOD | | CHAR | 000001 | 000000 | |
| Possible Values 1 | Backward consumption only | 2 | Backward/forward consumption | 3 | Forward consumption only | 4 | Forward/backward consumption | 5 | Period-specific consumption |
| |
|
| VINT1 | Consumption period: backward | VINT1 | | NUMC | 000003 | 000000 | |
| VINT2 | Consumption period: forward | VINT2 | | NUMC | 000003 | 000000 | |
| DISGR | MRP Group | DISGR | T438M | CHAR | 000004 | 000000 | |
| KAUSF | Component Scrap in Percent | KAUSF | | DEC | 000005 | 000002 | |
| ALTSL | Method for Selecting Alternative Bills of Material | ALTSL | | CHAR | 000001 | 000000 | |
| Possible Values | Selection by order quant. | 1 | Selection by explosion date | 2 | Selection by production version | 3 | Selection only by production version |
| |
|
| MISKZ | Mixed MRP indicator | MISKZ | | CHAR | 000001 | 000000 | |
| Possible Values 1 | Subassembly planning with final assembly | 2 | Gross requirements planning | 3 | Subassembly planning without final assembly |
| |
|
| WZEIT | Total replenishment lead time (in workdays) | WZEIT | | DEC | 000003 | 000000 | |
| VPMAT | Planning material | VPMAT | MARA | CHAR | 000040 | 000000 | |
| VPWRK | Planning plant | VPWRK | MARC | CHAR | 000004 | 000000 | |
| VPREF | Conv. factor f. plng material | VPREF | | CHAR | 000010 | 000000 | |
| TAKZT | Takt time | TAKZT | | DEC | 000003 | 000000 | |
| RWPRO | Range of coverage profile | RWPRO | T438R | CHAR | 000003 | 000000 | |
| LFRHY | Planning Cycle | LFRHY | T439G | CHAR | 000003 | 000000 | |
| RDPRF | Rounding Profile | RDPRF | RDPR | CHAR | 000004 | 000000 | |
| STRGR | Planning Strategy Group | STRGR | T461P | CHAR | 000002 | 000000 | |
| SOBSL | Special procurement type | SOBSL | T460A | CHAR | 000002 | 000000 | |
| RGEKZ | Indicator: Backflush | RGEKM | | CHAR | 000001 | 000000 | |
| Possible Values 1 | Always Backflush | 2 | Work center decides whether to backflush |
| |
|
| SCHGT | Indicator: bulk material | SCHGT | | CHAR | 000001 | 000000 | |
| | |
|
| WAERS | Currency Key | WAERS | TCURC | CUKY | 000005 | 000000 | |
| SHFLG | Safety time indicator (with or without safety time) | SHFLG | | CHAR | 000001 | 000000 | |
| Possible Values | Ignore safety time | 1 | Safety time for independent reqmts | 2 | Safety time for all requirements |
| |
|
| SHZET | Safety Time (in Workdays) | SHZET | | NUMC | 000002 | 000000 | |
| MDACH | Action Control: Planned Order Processing | MDACH | T46AC | CHAR | 000002 | 000000 | |
| LGPRO | Issue Storage Location | LGPRO | T001L | CHAR | 000004 | 000000 | |
| MTVFP | Checking Group for Availability Check | MTVFP | TMVF | CHAR | 000002 | 000000 | |
| BESKZ | Procurement Type | BESKZ | | CHAR | 000001 | 000000 | |
| Possible Values E | In-House Production | F | External Procurement | | No Procurement | X | Both Procurement Types |
| |
|
| KZECH | Determination of batch entry in the production/process order | KZECH | | CHAR | 000001 | 000000 | |
| Possible Values | Batch in goods issue; no confirmation required | 1 | Manual batch determination required upon release of order | 2 | Batch not required in prod./process order; confirmation reqd | 3 | Automatic batch determination upon release of order |
| |
|
| EISLO | Minimum Safety Stock | EISLO | | QUAN | 000013 | 000003 | |
| PLIFZX | Consider Planned Delivery Time of the MRP Area | MD_PLIFZ_DB | | CHAR | 000001 | 000000 | |
| Possible Values | Use Planned Delivery Time of the Plant | X | Use Planned Delivery Time of the MRP Area |
| |
|
| LGFSB | Default storage location for external procurement | LGFSB | T001L | CHAR | 000004 | 000000 | |